Tillman & Tsoukkas
HomeAbout usCommercialRESIDENTIALContact Us
Commercial
Offices
Hi-Tec Industrial
Retail and Leisure
Residential Developments
Contaminated Land
Temporary Works


Office

The office developments completed include 5 storey buildings, which are required to be designed to withstand progressive collapse from explosion loadings, to 80,000 sq.ft. prestige air conditioned offices with access floors and internal atria and underground parking.

The structures are designed in masonry, reinforced concrete or structural steel depending upon architectural requirements and cost.

Foundations can be simple mass concrete bases, or more complex reinforced concrete balanced foundations and rafts, to piling in difficult soil conditions or where a high water table exists.

We are also fully conversant with the Construction (Design and Management) Regulations and will provide the Planning Supervisor with all the necessary structural design risk assessments.

 

Bath Road
Slough

Easthampstead Road
Bracknell
 

Dorking High Street
Dorking

Balfour House, Churchfield Road
Walton on Thames
 

70 Wapping Lane
London E1

140 London Road
Guildford

 

Home | About us | Commercial | Residential | Contact us
Offices | Hi-Tec Industrial | Retail & Leisure | Residential Developments | Contaminated Land | Temporary Works

CONSULTING STRUCTURAL ENGINEERS

8 The Broadway, Wimbledon, London SW19 1RF | Tel: 020 8944 7575 | Fax: 020 8944 7676
Tillman_Tsoukkas@BTInternet.com


Successful QA accreditation for 10 years